Skip to content
London Reconnections

London Reconnections

Covering transport topics in and around London & beyond

  • Home
  • Industry News
  • Monthly Meet Up
  • Why We Write
Pittsburgh Railway Company Map in 1954

The Evolution, then Devolution, of Pittsburgh’s Streetcar Network

On 29 April 2025 By Daria Phoebe Brashear

Only a handful of North American cities have kept their pre-war streetcar networks. Why was …

Continue reading
Art Deco LR Towers w Airship Overhead

LR Update March 2025 – Interested in Joining Us?

On 26 March 2025 By Long Branch Mike
English Settlement Swindon Horse XTC album cover

English Settlement: Devolving Powers to Enable Intermodal Fare Integration: Part 2

On 13 March 2025 By Long Branch Mike

Crossrail: 4tph to Terminal 5?

On 25 February 2025 By Pedantic of Purley
Amtrak Next Gen Long Distance Fleet cocoon seating render

Railway Interiors – Next Generation Fleets Part 2

On 13 February 2025 By Long Branch Mike

In Pictures: West Ham Bus Garage

On 22 September 2011 By John Bull In Buses

IanVisits, who is unfortunately a far better spotter of exciting Open House opportunities than this author, made use of the recent Open House weekend to pay a visit to West Ham bus garage. This resulted …

Continue reading

Aedas Appointed to Revamp Euston

On 22 September 2011 By John Bull In HS2, National Rail, Network Rail

Euston Concept Design Architects Aedas have been appointed to oversee a revamp of the existing concourse at Euston staton. In their own words: Aedas has developed a coherent language for the station wayfinding, retail signage …

Continue reading

Plane to SEN, Then Train From SIA: A Return to Southend

On 20 September 2011 By Mwmbwls In Airports, Crossrail, Crossrail 2, National Rail

Southend Airport’s new rail station, which we have covered before, finally opened this summer. John Geoghegan, writing in the Echo, reported: Southend Airport’s new £12million rail station will finally open for business on Monday (17th …

Continue reading

The Shape of London’s Rail Network – a Peek Into The Past

On 18 September 2011 By Lemmo In Crossrail, Crossrail 2, National Rail, Overground, Uncategorized

The recently published RUS for London and the SE makes it clear that significant new investment is required to meet expected travel demand in the next few decades, and this is in addition to the …

Continue reading

The Return of the Broad Street War Memorial

On 16 September 2011 By John Bull In ELL, History, Overground

In focusing our attention on the ELL Extension to the south, we appear to have unfortunately missed on a little bit of activity to the north – the re-siting of the Broad Street War Memorial. …

Continue reading

Stretching the Line: Why We Do (and Don’t) Extend Tube Lines

On 15 September 2011 By Pedantic of Purley In Bakerloo Line, Battersea Extension, Camberwell extension, Central line, Crossrail, Jubilee line, London Underground, Northern line

With Crossrail under construction and extensions to both the Bakerloo and Northern Line being mooted, it seems a pertinent time to provide a brief reminder into some of the whys and wherefores for those less …

Continue reading

Northern line weekend closures September 2011 – January 2012

On 14 September 2011 By George Moore In London Underground, Northern line

The Northern line upgrade is at full pace now, with Automatic Train Operation (ATO) due for late 2012/early 2013. ATO is also in place on the Central, Jubilee and Victoria lines. Starting over two years …

Continue reading

Further Oyster Expansion Beyond London Under Discussion

On 13 September 2011 By John Bull In National Rail, Oyster, TfL

Tom Edwards over at BBC London is reporting that discussions are now actively underway between the DfT, TfL and FCC over the expansion of Oyster onto more services. TfL first mooted the idea of further …

Continue reading

Site News: Who Do You Think You LR?

On 12 September 2011 By John Bull In Site news

Thanks to all who continue to provide feedback on the new site design. I’ve now made another couple of tweaks, based on that feedback: The background (and text in the “inverted” site version) are now …

Continue reading

In Pictures: Farringdon and High Holborn

On 12 September 2011 By John Bull In Circle line, History, London Underground, Metropolitan line

Mikey’s Flikr pool is one that we have raided (with his permission) before, as it is often home to some impressive images from London’s Transport history. This week is no exception, with two excellent images …

Continue reading

Site Tweaks

On 10 September 2011 By John Bull In Site news

Thanks to everyone who has commented so far on the design. Some changes (and clarifications) are below: Colour Scheme As a couple of commentors have pointed out, black on white is the easiest combination for …

Continue reading

Putting the Junction into Silwood Junction

On 10 September 2011 By Mwmbwls In ELL, Overground

The scope of the first phase of the East London Line Extension was modified to include a flying junction at Silwood just north of New Cross Gate. The basic flying junction infrastructure, embankments, bridge and …

Continue reading

Welcome to the New Website

On 9 September 2011 By John Bull In Site news

Welcome to the London Reconnections site. Hopefully it’s relatively bug-free (we’ve done as much testing as we can), but if you have any problems, questions or suggestions we’d certainly like to hear them. Just post …

Continue reading

An Un-natural Selection: Why London’s Franchises Should Be Devolved

On 8 September 2011 By John Bull In National Rail, Network Rail, Overground

In the concluding part of our recent series on the London Overground, we talked about the future of TfL’s Concession system. We also touched briefly on the wider topic – the “elephant in the room” …

Continue reading

Haykerloo?

On 7 September 2011 By Mwmbwls In Bakerloo Line, National Rail, Network Rail

Back in September 2010, JB raised the question of possible extensions to the Bakerloo line south from Elephant and Castle to Hayes, as in Hayes but not as in Hayes and Harlington. The former being …

Continue reading

Posts pagination

«Previous Posts 1 … 91 92 93 94 95 … 112 Next Posts»

Recent Comments

  • fbfree on Discontinuous Third-Rail Idea for West of England Line (RailMagazine)
  • Long Branch Mike on French railway operator tests solar panel prototype between unused train tracks (E+T)
  • Emma Dawson on Crossrail Numbers Rise Again
  • Garry Brown on Monday’s Friday Reads – 5 May 2025
  • Paul Rowntree on Discontinuous Third-Rail Idea for West of England Line (RailMagazine)

Industry news

  • Monday’s Friday Reads – 5 May 2025
  • Friday Reads – 2 May 2025
  • The Evolution, then Devolution, of Pittsburgh’s Streetcar Network
  • Monday’s Friday Reads – 28 April 2025
  • Friday Reads – 25 April 2025
All content copyright London Reconnections