Skip to content
London Reconnections

London Reconnections

Covering transport topics in and around London & beyond

  • Home
  • Industry News
  • Monthly Meet Up
  • Why We Write
Pittsburgh Railway Company Map in 1954

The Evolution, then Devolution, of Pittsburgh’s Streetcar Network

On 29 April 2025 By Daria Phoebe Brashear

Only a handful of North American cities have kept their pre-war streetcar networks. Why was …

Continue reading
Art Deco LR Towers w Airship Overhead

LR Update March 2025 – Interested in Joining Us?

On 26 March 2025 By Long Branch Mike
English Settlement Swindon Horse XTC album cover

English Settlement: Devolving Powers to Enable Intermodal Fare Integration: Part 2

On 13 March 2025 By Long Branch Mike

Crossrail: 4tph to Terminal 5?

On 25 February 2025 By Pedantic of Purley
Amtrak Next Gen Long Distance Fleet cocoon seating render

Railway Interiors – Next Generation Fleets Part 2

On 13 February 2025 By Long Branch Mike

Thameslink and the NAO: part 3: All’s well that ends well?

On 20 June 2013 By Pedantic of Purley In DfT, Financial reports, Thameslink

This article, following on from part 1 and part 2 of articles on the report from the National Audit Office (NAO), was intended to be very short and mainly deal with the limited NAO comments …

Continue reading

West London Line cocooned by Earls Court development

On 13 June 2013 By Lemmo In District line, London Underground, Overground, WLL

The massive redevelopment at Earls Court took a step closer to fruition in November 2012 when the Royal Borough of Kensington & Chelsea gave its outline planning approval. The London Borough of Hammersmith & Fulham …

Continue reading

Thameslink and the NAO: Part 2 – Wherefore Art Thou Siemens Rolling Stock?

On 10 June 2013 By Pedantic of Purley In DfT, Financial reports, Rolling stock, Thameslink

In part one we looked at the verdict of the National Audit Office report on Thameslink and more specifically on the infrastructure work done so far. In part two we look in detail at the …

Continue reading

Thameslink and the National Audit Office: Part 1

On 7 June 2013 By Pedantic of Purley In Construction projects, DfT, Financial reports, Network Rail, Thameslink

It is the same old story. We were planning on giving articles about Thameslink a break and then something else comes along. This time it is a report from the National Audit Office (NAO). This …

Continue reading

Crossrail 2: Doing Nothing Is Not An Option

On 4 June 2013 By John Bull In Crossrail 2

Because of an article being planned analysing the October 2015 Crossrail 2 consultation, this thread is now locked and it is no longer possible to add comments. “The ultimate false economy would be to delay …

Continue reading

In Pictures: Refurbishing the 95 Stock

On 29 May 2013 By John Bull In In Pictures, London Underground, Northern line, Rolling stock

Whilst debate continues over Deep Tube and the S-Stock rollout pushes forward, other rolling stock changes are still happening quietly elsewhere. Below are thus several pictures of the newly refurbished 95 stock on the Northern …

Continue reading

Catching Up With The Committee: Part 2

On 23 May 2013 By The Walthamstow Writer In Cycles, London Bridge, Overground, Rail devolution

Rail devolution is something that remains high on both the Assembly and TfL radars, and so it was no surprise when it reared its head at the April Transport Committee meeting. Joanne McCartney opened this …

Continue reading

Catching Up With The Committee: Part 1

On 21 May 2013 By The Walthamstow Writer In London Underground, Northern line, Overground, Rolling stock, TfL

A month is a short time in Transport Politics. Whilst today’s Transport Committee is set to look at Crossrail 2 (a topic to which John Bull will be turning his eye shortly), last month’s meeting …

Continue reading

The Life, Death and Rebirth of Lea Bridge Station

On 20 May 2013 By John Bull In DfT, History, Network Rail

Somewhat buried amongst a number of railway-related announcements from the DfT this month was final confirmation of something that Waltham Forest council have been pushing for some time – the reopening of Lea Bridge Station. …

Continue reading

Over and Under: Thameslink, Crossrail and Woolwich Questions

On 19 May 2013 By Mwmbwls In Crossrail, Thames crossings, Thameslink

Images bring to life many London Reconnections pieces. We are lucky to have a band of chums willing to brave frostbite, heat stroke and going rusty to capture stuff on our behalf. Therefore our thanks …

Continue reading

Northern Line Postscript: Deep In The Heart Of Camden

On 14 May 2013 By Pedantic of Purley In London Underground, Northern line

Our recent article on future Northern Line upgrades was not really meant to be about one particular aspect but how the pieces as a whole fitted together. It was acknowledged in the title that the …

Continue reading

We Need To Talk About Camden: The Future of the Northern Line

On 6 May 2013 By Pedantic of Purley In London Underground, Northern line, Rolling stock

A very strange thing has happened in the past year or so regarding London Underground and the Northern Line – senior managers have actually wanted to talk about it. This comes as quite a surprise. …

Continue reading

Case Closes on Crossrail at Kensal

On 3 May 2013 By John Bull In Crossrail

For a number of years now, we have covered Kensington and Chelsea’s push to have a Crossrail station approved. The campaign arguably began in earnest back in 2008, when the Borough began to work towards …

Continue reading

Acid on the Jubilee: A Major Challenge, not a Soundbite

On 30 April 2013 By John Bull In Jubilee line, London Underground, Uncategorized

Yesterday saw a plethora of headlines hit both the London papers and the web about the Jubilee Line, as it was revealed that closures would be required in order to allow work to address problems …

Continue reading

Tragedy and Turnaround: A History of St Johns Station – Part 2

On 29 April 2013 By Pedantic of Purley In History, South Eastern

In part one we recalled the history of St Johns station up to World War II. In that time the the station had already been subject to more change than most stations have in their …

Continue reading

Posts pagination

«Previous Posts 1 … 81 82 83 84 85 … 112 Next Posts»

Recent Comments

  • Garry Brown on Friday Reads – 16 May 2025
  • Court Sloan on The Evolution, then Devolution, of Pittsburgh’s Streetcar Network
  • Anon Ped on Monday’s Friday Reads – 12 May 2025
  • W on Friday Reads – 9 May 2025
  • MiaM on French railway operator tests solar panel prototype between unused train tracks (E+T)

Industry news

  • Friday Reads – 16 May 2025
  • Monday’s Friday Reads – 12 May 2025
  • Tuesday LR Meeting 13th May 2025
  • Friday Reads – 9 May 2025
  • Monday’s Friday Reads – 5 May 2025
All content copyright London Reconnections